welcome海洋之神游戏平台(中国)官方网站海洋之神游戏平台

The performance of MySE5.5-155 in Xinhua Bay Farm

Date: 2018.10.30

In Xinhua Bay Wind farm,The availability of twooffshore MySE5.5-155 wind turbines is over 99.9%,and the total generationof October has already overfilled 4.6GWh.

welcome海洋之神游戏平台(中国)官方网站

海洋之神游戏平台